After weeks of wiring and plumbing I finally have something to photograph that looks like something. The only challenge is backing up far enough to frame a decent picture. The bathroom is not any bigger than it was before.
Friday, April 22, 2011
Wednesday, April 20, 2011
Right Tool for the Job
I haven't had peanut butter in a month because I hate mixing the nice, healthy, no-trans-fats kind we get back into peanut butter from its constituent oil and sludge. It takes forever and the oil invariably sloshes over the side.
But not tonight! I got smart and decided to find a small mixing paddle. I found this one and it might as well have had a little tag that said: "For Mixing Peanut Butter". I can't figure out anything else it would be good for. No one needs a dough hook for one dinner roll.
Kids, put it in the right-hand mixer socket so that it pushes down.
PB&J for lunch tomorrow. But if I were with you I'd join you at Massimo's.
Puzzled
Jesse, my boss who is leaving the company, told me about one of his favorite puzzles. It consists of 16 square pieces with a tab or a slot on each side. There are four different shapes of tabs and slots. Your goal is to assemble the puzzle into a 4 x 4 square. You can rotate or flip the pieces any way you want, but for the hardest challenge you have to assemble it using only the rough side or only the smooth side.
I figure there are over 2 x 1022 potential combinations if you do it the hard way. Jeremy, you can write that number out in decimal notation and tell me whether it is big or little.
Being a tool-using monkey I stuck the pieces into an Access table, generated the list of 64 different piece/rotations that have to be considered, wrote one query to come up with every valid combination of pieces into rows, wrote another to determine the valid combinations of those rows into 4 x 4 grids, and dumped the solutions to a spreadsheet.
There are 12 valid combinations if you don't allow yourself to flip any pieces. This is one of the simpler ones—simpler because I didn't have to rotate many pieces from my baseline orientation.
I figure there are over 2 x 1022 potential combinations if you do it the hard way. Jeremy, you can write that number out in decimal notation and tell me whether it is big or little.
Being a tool-using monkey I stuck the pieces into an Access table, generated the list of 64 different piece/rotations that have to be considered, wrote one query to come up with every valid combination of pieces into rows, wrote another to determine the valid combinations of those rows into 4 x 4 grids, and dumped the solutions to a spreadsheet.
There are 12 valid combinations if you don't allow yourself to flip any pieces. This is one of the simpler ones—simpler because I didn't have to rotate many pieces from my baseline orientation.
Tuesday, April 19, 2011
Bunnies at Home
Sunday, April 17, 2011
Lazy Weekend
Somehow I had a little bit of trouble getting inspired to work this weekend. I think it was the combination of jet lag, work stress, lack of sleep, and learning from the Italians that one doesn't have to be full speed ahead all of the time. The end result was that this weekend was more of a "pottering" pace than some of the others have been.
The construction was not helped along by my day job. I was so bothered by how little time I had to work on my big project last week that I decided to one big piece of it out of the way Friday night instead of starting into construction as I had been. I ended up working until 2 AM. Yes, that is the wild bachelor, out to all hours! So not only did I not get any construction done Friday night, but for some reason I didn't get any done Saturday morning, either.
First up for the weekend was to finish the electrical rough-in. I got the last bits of that done about noon today. The wiring rough-in is done all the way back to the breakers. Girls, I even replaced that malfunctioning smoke detector in your bedroom!
Wiring does not make for great photography, but here is a representative sample anyway.
With wiring done I could clean up all the debris and tools and start getting the bathrooms ready for sheetrock. It is amazing how long it can take to put away tools, pick up trash, and vacuum. I needed my crew of young workers.
The other big milestone I was going for was the insulation. I almost made it, which is pretty good considering that I didn't start until after lunch, stopped in time for 5:00 mass, and put in a double layer (R-30 on top of R-19) around plumbing, wiring, and a skylight. The skylight insulation is done, as is all of the R-30. I just have to finish putting the R-19 in from underneath.
I like the "touchable" pink insulation you see there! It is the regular fiberglass insulation we are used to, but they put a very thin perforated plastic sheet around it. It doesn't put nearly as much glass dust in the air and it doesn't shred every time you try to move it. It was less that 10% more expensive than the unwrapped variety, and worth every penny. But is isn't available with a vapor barrier.
Let's see. I described the weekend as pottering, so let me list a few of the other necessary odds and ends:
The construction was not helped along by my day job. I was so bothered by how little time I had to work on my big project last week that I decided to one big piece of it out of the way Friday night instead of starting into construction as I had been. I ended up working until 2 AM. Yes, that is the wild bachelor, out to all hours! So not only did I not get any construction done Friday night, but for some reason I didn't get any done Saturday morning, either.
First up for the weekend was to finish the electrical rough-in. I got the last bits of that done about noon today. The wiring rough-in is done all the way back to the breakers. Girls, I even replaced that malfunctioning smoke detector in your bedroom!
Wiring does not make for great photography, but here is a representative sample anyway.
| For lights and fan in the boys' bathroom |
With wiring done I could clean up all the debris and tools and start getting the bathrooms ready for sheetrock. It is amazing how long it can take to put away tools, pick up trash, and vacuum. I needed my crew of young workers.
The other big milestone I was going for was the insulation. I almost made it, which is pretty good considering that I didn't start until after lunch, stopped in time for 5:00 mass, and put in a double layer (R-30 on top of R-19) around plumbing, wiring, and a skylight. The skylight insulation is done, as is all of the R-30. I just have to finish putting the R-19 in from underneath.
| That really is the ceiling. I had the camera sideways. |
Let's see. I described the weekend as pottering, so let me list a few of the other necessary odds and ends:
- Finished putting in all the drawer slides for the girls' rooms.
- Started installing the drawers.
- Cut off all the nail heads that used to hold up the mesh behind the tile. Those nails were permanently bonded to the studs, wouldn't pull (the heads pulled off), and flush cutting was less likely to cause damage than hammering them flat. This was an hour: there were a lot.
- Insulated the hot water pipes in the walls and laundry room.
| Eleanor has drawers. W/o fronts. |
Sunday, April 10, 2011
Home Security System
The floor guys did a good job securing the house against burglars. They just needed to push the piano against the kitchen door and we would have been completely barricaded.
Subscribe to: